Welcome to ECBAY
Biogas holder for biogas project
Biogas holder for biogas project

1.Biogas holder for procurement and build times substantially reduced. 2.Steel Corrosion due to H2S is not an issue.

Membrane biogas holders have been available since the 1980’s being used widely in Europe. The membrane biogas holder offers the designer and end user a very flexible and economical alternative to a steel roof/bell structure. Why?

The capital cost outlay is substantially reducedNo need for expensive concrete structures or steel fabricationsCan be fitted to any size or shape of tank as a gas holder domeProcurement and build times substantially reducedSteel Corrosion due to H2S is not an issueEasy to maintain and repair any leaks.

Overview of our products:

Features
Volume Capacity:From 50 to 5000 m3 with pressures ranging from 1000-3000Pa depending on the size.
Raw materials:Are carefully selected and tested in-house before being used in order to warrant the product for a long working life without problems.
Half sphere shape:Provides for constant and repeatable movements of the gas bag and consistency of level transmitters for control.
Civil requirements:Simple flat concrete bases with cast-in anchor brackets. Above ground gas inlet / outlet pipework can be facilitated.
Easy to operate:The gasholder is fully automated and requires minimal visual maintenance.
Cost:The capital cost to provide and install a membrane gasholder provides a considerable saving over conventional designs.

Biogas holder for biogas project

Related Products
Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.