Welcome to ECBAY
plasma optimized waste to energy recovery ( waste incinerator , MSW management )
plasma optimized waste to energy recovery ( waste incinerator , MSW management )

Detailed Product Description


plasma optimized waste to energy recovery ( waste incinerator , waste management )

 

Items

bed-fludized incinerator

grate incinerator

plazma incinerator

capacity

Small and Medium Size below 150T/D

big size up200T/D

small and medium size below 150T/D

Application

Many comparatively

more

less

requirement on waste

the rubbish need to be smashed below 15cm

separation and smash is no need except large pieces

separation and smash is no need except large pieces

Equipment Cost

110%

100%

120~150%

Operation charges

130~150%

100%

90~110%

Prevent & treatment on pollution

Difficult

easy

easiest

Final left

Need secondary process

Need secondary process

No need

Equipment size

2/3 of general equipment

maximum

1/3 of general equipment

 

 

 

 

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.