Welcome to ECBAY
Bailey TSR- two lanes
Bailey TSR- two lanes

1.Triple row, single layer, chords to reinforce the structure 2. Length: 21.336m 3. Width: 4.2m 4. Whether reinforced: yes

    ZJ 200 equipped road steel bridge is a through type bridge, which is combined by single steel with the main truss roof beam. The main components include truss, transom, chess, connecting pins and various jointing parts. We also optimize bridge structure with limited element analysis and structure- reliable theory to improve the anti- fatighu service of structure.

Bailey TSR- two lanes

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.