Welcome to ECBAY
Grid tie wind solar hybrid controller 3KW
Grid tie wind solar hybrid controller 3KW

1.Two sets of control systems 2.Equipped with external dump load 3.Optional remote communication 4.Certificates: CE & Patent

FKJ-GT(Grid-tie)model Product Characteristics

1.The product is manufactured according the JB/T6939.1-2004 industrial standard and GB/T 19115.1-2003 national standard also with users’ technical requirements.

2.Two sets of control systems:PWM constant voltage system and three-phase dump load system.

3.PWM constant voltage control is 120% of the rated power of the wind turbine. In case exceeding of PWM’s capacity, the three-phase dump load will automatically start immediately. After 10-20 minutes, the three-phase dump load will stop and the wind turbine will re-start to resume power supply to ensure the safe running of the overall wind turbine generation system.

4.Under the strong or super-strong wind conditions, the controller can conduct constant voltage output to ensure the inverter safety running.

5.Under the condition of disconnected grid-connected inverter, the controller can conduct constant voltage output and wait for inverter resumption.

6.The three-phase dump load of the controller will automatically start and the inverter will stop grid output when the power grid is off. As soon as the grid power resuming, the controller stops three-phase dump load and the inverter will resume power supply.

7.For the different wind turbine generator type, the controller can be equipped with mechanical yawing, furled empennage, mechanical or hydraulic, pneumatic, electric magnetic and other brake functions.

8.The inside of the controller is equipped with surge arrester. Contain the over voltage into the wind turbine under the bearable voltage of the equipment or system. On another way, to conduct the strong lightening current into the earth directly to avoid any damage of equipment.

9.The below LED status indication can be found on the front panel: indications of wind turbine, dump load, three-phase dump load delay time, under pressure, grid power and DC output voltage.

10.Voltmeter indication: Indicate the controller DC output voltage.

11.The controller is equipped with emergency stop switch; in case of emergency, press down the emergency stop button in the front panel to cut off all power supply of the controller and the wind turbine will immediately carry out three-phase dump load.

12.The controller is equipped with manual three-phase dump load switch. To using this switch, the wind turbine will carry out three-phase dump load forcibly.

 

Technical Parameters of the FKJ-GT model Grid-tie Wind turbine Controller

Type

3KW

Function

rectifier ,control

Operating environment

Temperature -10-40°C,humidity≤80%

PWM constant voltage

≥380dc

3-phase dump load voltage of the wind turbine

410±5Vdc

Time-lapse of the wind turbine 3-phase dump load

12-20 min

Low-voltage

≤200Vdc

PWM dump load fuse

10A

Fuse of DC output

16A

Size of the controller

480*360*235 mm

Weight of the controller

 Kg

Size of the dump load

660*320*320 mm

Weight of the dump load

19 Kg

* Above parameter only for reference

Could be custom made to user specifications.  2. Could have solar power control subject to user demand.

Product components before the computer, all through inspection, ensure that computer components does not exist any quality problem.

 

 

 

 

 

 

Before the products leave the factory, the safety inspection to ensure that the user use safety.

Grid tie wind solar hybrid controller 3KW

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.