Welcome to ECBAY
JZC-5T-59 waste plastic oil refinery machine
JZC-5T-59 waste plastic oil refinery machine

1.High quality parts 2.Perfect quality control 3.Special designed heated insulation 4.Energy saving 5.Of great profits

 

The brief introduction of waste plastic oil refinery machine

 

 

 

1. Six models as below:

 

 

Model

Reactor size

weight

volume

capacity

1

JZ-2200-6000

2200*6000mm

27MT

23 M³

5 MT

2

JZ-2200-6600

2200*6600mm

29MT

25 M³

6 MT

3

JZ-2600-6000

2600*6000mm

32MT

32 M³

8 MT

4

JZ-2600-6600

2600*6600mm

34MT

35 M³

9 MT

5

JZ-2800-6000

2800*6000mm

35MT

37 M³

10 MT

6

JZ-2800-6600

2800*6600mm

38MT

41 M³

12 MT

 

2. The whole batch time:

 

Model

Feeding

Processing

Cooling

Discharge

total

2200*6000

2hr

7-8hr

2hr

2hr

14hr

2200*6600

2hr

8hr

2hr

2hr

14hr

2600*6000

3 hr

10 hr

3 hr

3 hr

19 hr

2600*6600

3 hr

11 hr

3 hr

3 hr

20 hr

2800*6000

3 hr

12 hr

3 hr

3 hr

21 hr

2800*6600

3 hr

13-14 hr

3 hr

3 hr

23 hr

 

3. Fuel

 

The fuel can be coal, oil, gas & firewood.

 

4. End product percentage

 

Tyre oil 45%, Carbon black 35%, Steel wire 10-12%, Waste gas 8-10%

 

 

5. Delivery time

 

We will delivery the machine within 15-25days after get the advance payment.

 

6. Warranty and machine life

 

We guarantee the complete machine 2 years, the reactor life more than 4 years,others parts no need change lifelong expect the wearing parts.

 

7. The reactor raw material

 

The reactor is made of Q245R Boiler plate.

 

8. The machine installation

 

we will send engineer to buyer’s place when getting the machine. The engineer mainly install the machine and training your workers. it is free, you pay the ticket, accommodation and food.

 

9. FOB Port (China)

 

 

FOB lianyungang port, located in Jiangsu Province, China.

 

11.The warranty and after-service.

 

1)We will supply the foundation drawings to buyer after get deposit.

 

2)We will send engineers to install the machine when the machine reach buyer's factory. The engineer will installation,guide the machine, then training the workers for buyer.

 

3)We warranty the complete machine 2 years, we will maintenance all it life. When the machine can not running normally, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time.

JZC-5T-59 waste plastic oil refinery machine

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.