Welcome to ECBAY
API choke and kill manifold
API choke and kill manifold

1)WP:2000-15000psi 2)Nominal Bore:2-1/16"~4-1/16" 3)API 16C,API 6A Choke and kill manifold

Item

Component

Quantity

Material

1

Skid base

1

 

2

Hydraulic choke

1

 

3

Five-way piece

1

4130

4

Check Valve

1

 

5

Pressure Gauge

1

 

6

Needle Valve

1

 

7

Instrument Flange

1

4130

8

Gate Valve

10

 

9

Spacer Spool

2

 

10

Cross

5

4130

11

Blind Flange

7

4130

12

Spacer Spool

1

 

13

Gate Valve

2

 

14

Manual Choke

2

 

Application

   Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well’s technique of balance pressure, which can prevent the pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve’s opening, so balanced drilling can work under minimum pressure-difference.

 Specification and Structure

   Choke manifold consists of choke valve, gate valve, pipeline,fittings and pressure gauge etc, see the above drawing and gate valve part and choke valve part. Pressure level is divided into five levels, i.e. 14MPa ,21MPa ,35MPa,70MPa,105MPa . It can be designed according to the requirement of customer.

Operating Requirement

1. All the working pressure of parts in choke manifold should be matched with the working pressure of the BOP stack used.

   2. Choke manifold should be installed at the place where operator approach it conveniently, pressure test should be executed as installation, while the sealing test pressure should equal to the rated working pressure.

   3.Pipeline should be so smooth and straight as possible, the corner of the pipeline should be made of 120°shaped forged steel bent pipe, which should have adequately large bore.

   4. The working pressure gauge should be installed.

   5. In winter, the choke manifold be able to work under a low temp condition.

API choke and kill manifold

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.