3D projection mapping: 3d animation film i-tech multi-surface correction system i-tech video node control system
i-Tech 3D surface contruction impact loading not only able to cover all buildings, but also through a special location,design animation outside of the buildingstructure in accordance with the unique creativity and expression, within theoutline of the building into the animation to interpret the story,a real wake-upbuilding!
Video equipment implementation steps
1:Determine the location. i-Tech will send the technician to the site to measure and obtain the information. Multi-angle scene photos are required in advance.
2:Story board development.
3:Project management table.
4:3-5 working days prior to the implementation, i-tech set up the equipment and accurate adjustment on the building.
5:Implementation of site management(to ensure smooth implementation of project to achieve the desired results).
Technical implementation
1:On-site cabling and build a stable power.
2:Projector line frame structures.
3:i-tech interactive work area/lounge/equipment storage area.
4:Make sure there is nothing in front of the projector.
5:The brightness of the projector is depended on the building material and the surrounding environment.
3D projection mapping