Welcome to ECBAY
Small-sized Mobile Teppanyaki
Small-sized Mobile Teppanyaki

1.Name: Mobile Teppanyaki 2.Material: stainless steel , alloy steel 3.Use range: hotel,restaurant,cafe,food plaza

Product Name: Small-sized Mobile Teppanyaki  

I.Equipment Structure:

Teppanyaki is comprised of mainframe,surrounding decorations,fumes purifier and air blower.

II.Equipment heating mode

1,Gas

Coal gas:9’Calorific Value 10000   consumption:2.92m³/h

Liquid gas:9’Calorific Value 8500   consumption:0.85kg/h

Natural gas:9’Calorific Value 10000 consumption:1.2m³/h

2,Electric heated tube

Parameter:380V/50HZ  Power 7.5KW  Triphase five-wire system

3,Electromagnetic plate

Parameter:380V/50HZ  Power7.5KW  triphase five-wire system

III.Gas Teppanyaki Direction for use

1,Turn on air blower switch to exhaust air first.

2,Turn on Gas switch, attention: do not turn on totally.

3,Set fire to burner by electronic light strike or lighted torch, adjust the gas switch to control the fire. 

Mark:It may be hard to set fire because there’s air in the pipe, just set fire continuously

IV.Electric heated tube Direction for use

1,Turn on power switch.

2,Turn on Teppanyaki Power switch, Red light signs power.

3,Make sure turn on air blower switch.

4,Adjust the temporature on the operation plate, green light signs heating.

5,Turn off all switches after using.

IVI,Electromagnetic Plate Direction for use

1,Voltage and Power:

(1)Voltage range:380V–400V.

(2)Frequency range:50HZ–60HZ.

(3)Power:8kw-12KW.

2,Operation:

Turn power switch, It stays waiting up.Turn on start swich after setting the temperature you need,The plate start been heated, When it touches your setting temperature, It will keep 5 Celsius up or down;

Turn off start switch first when power is off, Turn off power switch after 5 minitues.

Mark:If you turn off power switch before start switch, You should put the start switch to the turn off position next time.

3,Protection:It enters waiting up situation if it hasn't been used for two hours,. Reset the start switch when you want to use it.

4,Temporature setting:The temporature can be set set by you, The temporaturerange is 0-400 Celsius, method is as follow:

Enter:press circle point key(0.5) temporature, enter temporature menue on temporature operation plate, Least significant digit on SV window starts to bicker.

Alteration:press< key to move the digit to left, press up key to alter the temperature up,press down key to let temporature down. Keep pressing up key,let temperature up continuity,keep pressing down key set temporature down continuity.

Exit:when aftering use,press circle point key for 0.5 second.

Attention:

1,Do not press so hard when using.

2,Pay attention to prevent water when clearing.

IVII,The install method for surrounding decoration(marble):

1,Fix the position of marble stall.

2,Carry marble according the heavy of them.

3,Put marble on the bracket, put the non-edging side to the plate surrounding trim strip.

5,Use glue to fox all joint line.

6,Clean the marble before solidify.

IVV.The Teppanyaki plate cleaning method

1,The temporature will be down after using,put some oil on the plate, use scouring pad(The green pad which I will send to you) to scrape it, It’ll be clean and shining.

2,Glaze salad oil on it after cleaning.

3,Clean the slad drawer every day.

4,Unscrew the four screw bolt on the chef side(rectangle one),pull out filter, use leanerto wash the filter, dry it and put back, one time every three month.

5,Put out the oil collecting drawer,drop the fumes oil, and wash it, Then put back.

Attention:You must put oil on the plate when you do not use it.

IVVI.Clean method of fumes purifier

1,Use the purifier door key to open the door, then you can see the electric case.

2,Make sure the power switch been Turn off.

3,Use screw driver to unscrew the fixed screw on the pole plate.

4,Pull out the filter and pole plate, do not pull so hard to destroy the component .

5,Inject water to the container which has been put leaner.

6,Put pole plate to the container to wish, about 10 minitues.

7,Dry it.

8,Use cotton clothto scrup and clean sundries such as oil extraction.

9,Install it back, and close the door.

Attention:Do not open the purifier when The electric power is on.

IVVII,Install of ElectricEquipment:

1,Unscrew thescrews on the temperature contral plate, dismount the face-plate.(picture 1).

2,Put the power wire in.

3,According to picture 2,contect L1,L2,L3,N line and grounding line.

4,Get through electric power, use special sleeve to protect the wire joint.

 5,Install the face-plate, and turn on the main switch.

Small-sized Mobile Teppanyaki

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.