concrete floor hardener Excellent abrasion resistance,reduce dust,Easy construction and miantenance,etc.
concrete floor hardener
requirements to basic level concrete:
1.Concrete label should be achieved C25 above, and pouring to elevation one time2.Slumps should be controlled in 8 cm, the highest should not be more than 15 cm.3.Aggregate maximum grain size is not higher than 2.5 cm,silt content below 1%.4.Concrete should stir uniformity, as less as possible water cement ratio .5.Should be planning before pouring,part storehouse construction,tamping,Make level.As per normal procedures ,finish the concrete smooth base level pouring.