Welcome to ECBAY
eccenetric overburden rock drill parts
eccenetric overburden rock drill parts

overburden drilling 1.efficient energy transfer 2.faster drilling speed 3.lower oil consumption 4.longer life,less failure

eccentric overburden drilling equipment:

1. 10 years manufacturing experience;

2. Certificate: ISO9001:2008

3. Material: Carbide

Eccentric Reamer System Step-by-step

1. When drilling starts, the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill bit assembly.

2. When the required depth is reached, rotation is reversed carefully, whereupon the reamer swings in , allowing the drill bit assembly to be pulled up through the casing.

3. Casing tubes that are to be left in the drill hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.

4. Drilling continues to the desired depth in the bedrock using a conventional drillstring.

NOD140 Eccentric Overburden Drilling Equipment

1

Casing Tube

Maximum O.D.: 171mm

Minimum I.D.: 155.6mm

2

Drill Pipe

Connection Thread: API2 3/8”Reg

O.D.: 89mm

Wrench Flats: 65mm

3

Guide Sleeve

Effective length: 205mm

4

DTH-Hammer

HD55, Cop54, SD5, DHD350R, QL50

5

Casing Shoe

L3=90mm L4=63mm D3=155.3mm D4=143mm

6

Guide Device

L1=55mm L2=160mm D1=141mm D2=154mm

7

Reamer

D5=138mm L5=69.5mm

Reaming Diameter: 185mm

Reamer has 7*14mm buttons

8

Pilot Bit

D6=138mm L6=66.5mm

Gauge button: 8*16mm

Face button:8*14mm

Technical Data

eccenetric overburden rock drill parts

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.