Welcome to ECBAY
aerial work platform 3
aerial work platform 3

aerial Work Platform can be powered by DC or AC according to the order. The external size is small after folded.

aerial Work Platform has passed the CE certification. It adopts aluminum mast design which is light, flexible and reliable. It is for two person working together in exhibition hall, warehouse, supermarket, airport, port, etc.1)The product can be powered by DC or AC according to the order.2)The external size is small after folded. It can be moved into elevator and pass ordinary door or narrow passage.3)There are two controllers for ascending and descending.4)It has unique upper platform and lower platform design.
Model No.GTWY6-2GTWY8-2GTWY10-2GTWY12-2
Max. Platform Heightmm600080001000012000
Max. Working Height8000100001200014000
Min. Platform Height18002020
Ground Clearance80
Lift Rated Capacitykg300250200
Platform Sizemm1210*6001450*600
Outspread Size1880*17602220*19602250*2570
Electrical SourceACv220-240
DC12
Aneroid Batteryv/Ah2*12/75
Chargerv/A12/15
Lifting MotorACv/kw220/0.75-1.5
DC12/2.5
Overall Lengthmm15601790
Overall Width840890
Overall Height18102030
Overall Net WeightACkg570630730825
DC610670770865

aerial work platform 3

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.