Welcome to ECBAY
popular T2 full spiral CFL lamp 8000hrs 15w
popular T2 full spiral CFL lamp 8000hrs 15w

popular T2 full spiral CFL lamp 8000hrs 1.100% raw material inspection 2.100% PCB inspection 3.Wattanty: 24months

Compact fluorescent lamp 7W/9W/11W/13W/15W/20W T2

1.tri-phosphor powder2.Flame-retardant PBT3.UL/CE/Rohs/EMC approved

Materials:
BaseIron and copper, alum for choosing in E14, E27, E26, B22
Tubepure tri-phosphor powder glass tube
Housing100% PBT
Electrolytic capacitorAISHI for 8000hrs and 12000hrs,Rubycom for 16000hrs

Similar product

Material:
BaseIron and copper, alum for choosing in E14, E27, E26, B22
Tubepure tri-phosphor powder glass tube
Plastic housing100% PBT
Electrolytic capacitorAISHI for 8000hrs and 12000hrs,Rubycom for 16000hrs
Packing:
Color box50pcs or 100pcs/Canton according to your demand
BlisterSingle blister or Double blister according to your demand
Payment and delivery time:
Lead time of production40-45days after deposit paid
Delivery portXiamen,Fujian
Payment termsT/T, L/C at sight
Sample:
Free samplefree samples for your test and freight paid by you
Delivery time of sampleone week

 More details:

Model         Wattage (W)Circle (Q)Lamp Base             Lumens (Lm)N.WG.WDimensions   (L1/L2/L3/L4/D/D1)mmPackage (L/W/H)cmPackage          pcs/ctn
YPZ-HUS-5W5W2.0E27/E14/E26/B222704.06.080/56/25/45/3852.5x27.5x22100
YPZ-HUS-7W7W2.5E27/E14/E26/B223804.16.385/56/30/45/3852.5x27.5x22100
YPZ-HUS-9W9W3.0E27/E14/E26/B225004.26.590/56/34/45/3852.5x27.5x24100
YPZ-HUS-11W11W3.5E27/E14/E26/B226104.56.896/56/40/45/3852.5x27.5x24100
YPZ-HUS-13W13W4.0E27/E14/E26/B227204.87.2100/56/50/45/3852.5x27.5x25100
YPZ-HUS-15W15W4.3E27/E14/E26/B228505.27.6103/58/50/45/3852.5x27.5x25100

Inspection process:

1)      Strict 100% raw material inspection before production.

2)      Lab testing inradom material and do the production sample for production dept.

3)      100% PCB inspection and tube spark before assembing

4)      100% 2hrs aging testing.

5)      On-site quality testing before packing

6)      QA inradom lab testing before shipment

Packing detail & payment:

Packing detail&Payment 

Color box 

50pcs or 100pcs/Canton 

Blister

Single blister or Double blister

Lead time of production

40-45days after deposit paid

Delivery port

Xiamen

Payment terms

T/T, L/C at sight

  BLISTER PACKING

Packing for Bulk-Cargo:

Certificate:

Factory:

popular T2 full spiral CFL lamp 8000hrs 15w

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.