Welcome to ECBAY
FA11 X-Ray protection lead door
FA11 X-Ray protection lead door

lead door 2mmPb Stainless Steel ISO9001/ISO13485/CE

Installation Instructions for the Casement Door

 

        Before the installation of the casement door, process the cement foundation according to the size of the door. Push the casement door into the doorway. There are some technical holes in the doorframe. Make holes in the cement foundation, then fix the door frame to it with the setscrews. Fill in the doorframe with the leadings for fear that the leakage of the X-rays.

        Please be careful to protect the painting surfaces of the door body and the fittings.

       The above mentioned is just for your reference. 

ISO9001

ISO13485

CE

 

FA11 X-Ray protection lead door

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.