Welcome to ECBAY
CNTS cooling tower
CNTS cooling tower

1.High Efficiency of Velocity Recovery 2.Superior Performance 3.Rigid and Solid Structure 4.Corrosion Preventive 5.Beactiful

 1.Low energy-consumption of operation2.Non-metalizing of the components3.Superior Performance4.Beautiful Shape

 

General

CNTS serial square counter flow cooling tower with FRP casing is a advanced kind of cooling tower with perfect technology and reliable performance.

The cooling tower has passed the inspection and test for the running tower and all kind of performance data have hit or exceed the national standard value stipulated in GB7190-1997 “Cooling tower of Plastic with enhanced glass fiber”.

CNTS serial cooling tower with ascendant performance and good quality have been widely used in the circulating water system in such fields as Air-conditioning, Electric, Chemical, Metallurgy.

 

Tower Type

CNTS serial counter flow cooling tower applies the full steel structure.

 

Performance

The result from the detail thermodynamic and resistance calculation indicates that the performance of the proposed cooling tower can meet the requirement of the design technique.

 

Maintenance 

The convenient maintenance for the tower is fully considered in this proposal. A stairway is designed on one side of the tower block so that it’s easy to climb up to the fan deck for maintenance and anti-fire requirement. An access door is designed on the fan stack, and a check-way to the fan supports platform is designed inside of the fan stack.

 

Optimize Design

This proposal is a result from summing-up and studying the years’ experience of design and fabrication of the count flow cooling tower with similar model and similar flow rate. To seek the best cooling effect for a cooling tower , our technicians have being done a mass of experiments by simulating different conditions to seek the best data of design and to decrease the resistance of tower as possible.

In this proposal, there are much margin for such data as the thermal performance value of filling, air flow of fan and the power of motor so that the cooling tower can continually work under the condition with bad weather and impact load.

 

Code for Design, Fabrication,Inspection and Acceptance

GB7190.1-1997

Section I: Small and Middle Scale Glass Fiber Reinforced Plastic Cooling Tower

GB7190.2-1997

Section II: Large Scale Glass Fiber Reinforced Plastic Cooling Tower

GB/T50102-2003

Industrial Circulation Water Cooling Tower Design Code

HG20522-92

Chemical Corporation Cooling Tower Design Code

CD80A1-83

Counter Flow Induced Draft Cooling Tower Test Code

GBJ17-88

Steel Structure Design Code

GB50010-2002

Concrete Structure Design Code

GB50007-2002

Construction’s Ground-Base/ Foundation Design code

GBJ9-87

Construction Structure Load Code

GBJ11-89

Construction Seismic Design Code

GB50205-2001

Acceptance Code for Steel Structure Construction

GB1449-83

Performance Test method for Fiber reinforced Plastic

GB/T2406-93

Burning Performance of Plastic Test Method --- Oxygen Index Method

DL/T742-2001

Specification for Plastic Component

GB1458-78

Stretch Test method for Fiber Winding Ring Sample

GB2567-2578-81

FRP Test method

GB3139-82

Heat-conduct factor of FRP Test Method

GB1446-83

Fiber Reinforced Plastic Performance Test method

GB3354-3357-82

Fiber Reinforced Plastic Mechanics Performance Test Method

GB3854-83

Fiber Reinforced Plastic Bachol Hardness Test Method

GB1462-1463-88

Test Method of water-absorbing Rate, Density, and Relative Density of  Fiber Reinforced Plastic

GB2577-89

Test Method of Resin Content of Fiber Reinforced Plastic

GB/T1040-92

Test Method of Stretching Performance of Fiber Reinforced Plastic

GB/T2406-93

Test Method of Burning Performance of Plastic – Oxygen Index Method

GB/T18370-2001

Glass Fiber Woven Roving

QW/KH 7.1-01

Procedure Regular For Product Manufacture

QW/KH 7.4.3-01

Inspection Regular For Raw Material And Sub-vendor

QW/KH 8.2.4-01

Product Quality Inspection Regular

 

 

The Quality Assurance System

In order to adapt the fast developed market economy better and serve customers, our company strengthens its internal enterprise management to ensure the best product, we established ISO9001 quality assurance system and so the enterprise produce quality is well ensured.

 

The product quality promises:

1.The quality assurance period will be one year from time of succeeding in debugging after installation.

2.The life maintenance will be executed for the product but the maintenance cost will be deducted.

3.The assurance operation period of the components of the product is as follows,

The FRP component:              20 Years

Water Distribution system:          20 Years

The Drift Eliminator:                20 Years

The Plastics Fill:                   20 Years 

CNTS cooling tower

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.