Welcome to ECBAY
Casing head, Entirety type casing pipe head.
Casing head, Entirety type casing pipe head.

Casing head 1.API,CE,ISO certificates. 2.High quality with competitive price 3.Best after-sale service.

Casing head1.API,CE,ISO certificates.2.High quality with competitive price3.Best after-sale service.

Casing head, Entirety type casing pipe head.

High quality with competitive price!

Detailed Introduction

 

Entirety-type casing pipe-heads are mainly used for closing the ring-shaped spaces between the surface layer casing pipe and the first & secondary technical casing pipes and between different layers of the oil layer casing pipes. The structure of this casing pipe-head is that the main body of the pipe-head is connected with the surface casing pipe with screw threads and can be directly connected with earth drilling blowout preventer. A new type of hanger shoulder is used, which could largely increase the loading capacity, enhance the safety guarantee, meet all process requirements during earth drilling, increase the standardization degree of the well head installation, shorten the well building period, reduce the working strength for the workers and increase the working efficiency.

Type:

Type1:T13 3/8×7”(5 1/2”)-351. Technical Parameters

1.1 Specification Grade: PSL2

1.2 Performance Grade: PR1

1.3 Temperature Grade: P

1.4 Material Grade: DD

1.5 Rated Pressure: 34.5MPa

1.6 Diameter: 318mm

1.7 Load Bearing Capacity: 2000KN

1.8 External Dimension: 675×254×459mm

Type2:T10 3/4×7”(5 1/2”)-351. Technical Parameters

1.1 Specification Grade: PSL2

1.2 Performance Grade: PR1

1.3 Temperature Grade: P

1.4 Material Grade: DD

1.5 Rated Pressure: 34.5MPa

1.6 Diameter: 254mm

1.7 Load Bearing Capacity: 2000KN

1.8 External Dimension: 675×254×459mm

 

Product Characteristics: The design is advanced, the structure is rational, the performance is excellent, the installation on-site is convenient and the appearance is simple and graceful, so that the products could satisfy the various technical requirements during the process of well drilling, could improve the standardization level of well mouth installation, could shorten the well construction period, could reduce the worker’s labor intensity, could improve the work efficiency and have favorable social benefit and economic benefit.

 

 

Casing head, Entirety type casing pipe head.

Casing head, Entirety type casing pipe head.

Casing head, Entirety type casing pipe head.

Related Products
Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.