Autoclaved flyash brick production line
Autoclaved flyash brick production line

Detailed Product Description


brick production line 

Autoclaved flyash brick production line

Products specification

Standard brick240mm×115mm×53mm,Void ratio0,grading strength:20.0MPa

Quality standard

.

Stength and frost resistance

Strength level

Average strength index

Freezing index

Compression strengthMPa

Breaking strength(MPa)

Compression strengthMPa

Mass loss rate%

MU20

≥20

≥4

≥16

≤2

MU15

≥15

≥3.2

≥12

≤2

MU10

≥10

≥2.5

≥8

≤2

Dry shrinkage

Dry shrinkage valuePremium and top class0.65mm/m;quality part0.75mm/m.

Main materials

1.FlyashFly ash quality is in accordance with JC/T409-1996 related regulations on flyash of construction materials. That concretely describes as SiO2≥40; Al 2O3:15-35%; SO3≤2; burnt loss≤12;sineness: 0.045mm Square hole sievetailing over≤45 Flyash radioactivity:in accordance with GB6763.
2.Coal cinderProduced from thermal power plant,carried by truck to brick producing factory.

3.QuicklimeIn accordance with JC/T621-1996: CaO+MgO≥75%MgO≤5%CO2≤5%
4.GypsumIn accordance with JC16-82:  CaSO4·2H2O>70%
5.SandIn accordance with JC/T622-1996:Medium coarse sand,no impurity substance.

Process description

Storage of raw materials and preparation of mixed powder.
1.1Quick lime and gypsum
Lime piece and gypsum piece is trucked to factory and  poured into receiving hoppers by a forklift.Quick lime and gypsum is respectively crushed by a jaw crusher and sent respectively into quicklime silo and gypsum silo by a bucket elevator.Quicklime and gypsum in the silos is then sent to ball mill in fixed proportion by electromagnetic vibrating feeder for mixed fine grinding. The well fine grinded materials is lifted by a bucket elevator into a cementing materials silo on the batch plant for use. 

1.2Fly ash
Wet fly ash is carried by a belt conbeyor to storage shed ready for use or immediately measurement.

1.3Sand
Sand is trucked to work shed and pured into a receiving hopper by a forklift then conveyed by beltfor measurement.
2.Mixted powder stirring
Above mentioned sand,flyash,cementing materials in sequence are discharged into double-shaft-mandatory strining machine.  Water added,above materials are stirred mandatorily.Then the mixed-ready slurry is sent into slaking silos.Well slaked slurry goes into wheel roller for grinding.Then the grinded slurry will be belt-conveyed to hopper of brick moulding press.

3.Brick green body moulding
The moulding press hopper feeds the slurry into pree mould and brick green body is produced.The following step is to load brick green body to steam-curing cart whose capacity is 1180 pieces of bricks.

 4.Curing and storage

Steam curing cart loaded with brick green body is drawn by a hoist into autoclave for curing. The same hoist will draw steam curing cart together with finished products out and send them to products warehourse.Finished products will be inspected by appearance and graded stacking.

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.